The coating application sequence should be as follows:
a)     The exposed steel area and adjacent pipe coating shall be cleaned of all   dust   dirt,   moisture,   salts,   grease   or   other   contaminants,   if necessary using a non-contaminant solvent, Xylene or equal.
 
b)     Weld  area shall be thoroughly abraded to a near white metal finish, SIS  SA 2 ½ to yield an anchor  pattern of 50-100  microns. Anchor pattern  shall  be  checked  using  Testex  Press-o-film  tape.  Blasting material shall be either industrial grade grit or copper slag, approved by the Engineer prior to its use at site. Sand shall not be used for blast cleaning of joints. No blasting shall be carried out if Relative Humidity is above 80 %. The line coating adjacent to the weld area shall also be sweep blasted and should be bevelled to less than a 30° angle. The exposed steel and coated areas should be wiped clear of all foreign materials. Grit/slag used shall be free of any slat contaminants and shall be sieved to give the required anchor pattern.
 
c)     Adjacent  line  coating  over which the shrink sleeve shall be shrunk, shall be sweep blasted to give it a rough finish. The sweep blasting shall extend 25 mm beyond the edge of the shrink sleeve.
 
d)     Just  prior  to sleeve shrinking, the surface of the blast cleaned joint steel area shall be tested for salt contamination using an Elcometer Salt contamination test instrument. The level of salt contamination on the   joint    steel   shall    not    exceed   4    microgram/sq.cm.    If   the contamination level exceeds this value, the joint shall be cleaned with clean  stilled  water  and   re-blasted.  Contamination  of  the   blasting medium may also have to check to ensure that the 4 microgram/sq.cm level is not exceeded.
 
e)     After blasting and as soon as possible (within ½ hour of blasting), joint area   shall   be   pre-heated   to   the    manufacturer’s   recommended minimum  temperature.  A  pyrometer  shall  be  used  to  ensure  that correct temperature  is  reached on  steel and the  line coating. As a minimum, pre-heating of the steel surface 5 degC above dew points is required.
 
11
Contact Us

Author:

Ms. Tao

Phone/WhatsApp:

++86 19182078675

Popular Products
You may also like
Related Information
Libya slow recovery in oil supply does not affect oil prices

The market is generally worried that the European debt crisis will affect global crude oil demand expectations. At the beginning of this week, international crude oil prices fell below 85 US dollars,...

How to Selecting the sleeves?

How to Selecting the sleeves? If you have project that need heat shrinkable sleeves, how to choose correct one ? Firstly, Confirm the pipe operating temperatures, such as 50 Deg C, 60 Deg C, 80 Deg...

Adhesive of Pipeline Heat Shrinkable Sleeves

Heat-shrinkable materials consist of an external backing made of extruded andcross-linked polyolefin and an internal adhesive made of thermoplastic material. The shrinkage ofthe backing instils a...

Detailed Introduction to insulated steel pipes

Insulated steel pipes are widely used in our daily lives, and their presence can often be found in liquid and gas transportation pipelines, petrochemicals, and centralized municipal engineering. So,...

Related Categories

Email to this supplier

Subject:
Mobile:
Email:
Message:

Your message must be between 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send